Application / 02
Factories & Industrial Parks
Shift-change hot water, treated as a utility.
Canteens, washrooms and shower blocks in industrial facilities hit the system hard at shift change. A packaged heat pump plant delivers utility-grade hot water without a boiler license, a chimney, or a dedicated mechanical crew.

Demand profile
What makes this application demanding
Concentrated demand windows
Hundreds of workers may shower within the same hour. Tank-integrated systems are sized around recovery between shifts, not continuous boiler output.
Energy cost per worker
Facilities teams track utility cost per head. Heat pump systems typically use a fraction of the electricity of resistance heating for the same output.
Minimal maintenance staffing
Plants run lean. Equipment must be self-managing: automatic defrost, scheduling, and fault indication on one controller.
The fit
Why all-in-one fits factories
- Arrives as one lift — no multi-trade installation inside an operating plant
- Factory-tested refrigerant circuit removes the most common commissioning failures
- Parallel units isolate maintenance: service one while others carry the load
- Robust enamel tank and industrial controller suit dusty, high-duty environments
Sizing support
Tell us worker count per shift, shower points and available installation area — we propose unit count and tank volume.
Send your project detailsStart a conversation
Tell us your project. We will size the system with you.
Share your application, daily hot water demand and destination market. Our export team replies with a configuration proposal and quotation — usually within one working day.